{"id":2194,"date":"2023-03-01T14:57:41","date_gmt":"2023-03-01T19:57:41","guid":{"rendered":"https:\/\/www.isaproyectos.com\/culminacion-de-obras-en-nueva-refineria-de-talara\/"},"modified":"2023-10-13T15:56:13","modified_gmt":"2023-10-13T20:56:13","slug":"culminacion-de-obras-en-nueva-refineria-de-talara","status":"publish","type":"post","link":"https:\/\/www.isaproyectos.com\/en\/culminacion-de-obras-en-nueva-refineria-de-talara\/","title":{"rendered":"CULMINATION OF WORKS IN THE NEW TALARA REFINERY"},"content":{"rendered":"\n<p>The 31 contracts with the Talara Refinery are in the process of being finalized, among the most important are contracts for electrical assembly and instrumentation, as well as the installation of GRP pipes, superduplex, 316L stainless steel, carbon steel, among others,<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.isaproyectos.com\/wp-content\/uploads\/2023\/10\/3-1-1024x768.jpeg\" alt=\"\" class=\"wp-image-2348\" srcset=\"https:\/\/www.isaproyectos.com\/wp-content\/uploads\/2023\/10\/3-1-1024x768.jpeg 1024w, https:\/\/www.isaproyectos.com\/wp-content\/uploads\/2023\/10\/3-1-300x225.jpeg 300w, https:\/\/www.isaproyectos.com\/wp-content\/uploads\/2023\/10\/3-1-768x576.jpeg 768w, https:\/\/www.isaproyectos.com\/wp-content\/uploads\/2023\/10\/3-1-249x187.jpeg 249w, https:\/\/www.isaproyectos.com\/wp-content\/uploads\/2023\/10\/3-1-1170x878.jpeg 1170w, https:\/\/www.isaproyectos.com\/wp-content\/uploads\/2023\/10\/3-1.jpeg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Assembly of electrical pipelines for co-generation plant in Talara Refinery.<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The 31 contracts with the Talara Refinery are in the process of being finalized, among the most important are contracts for electrical assembly and instrumentation, as well as the installation of GRP pipes, superduplex, 316L stainless steel, carbon steel, among others,<\/p>\n","protected":false},"author":4,"featured_media":2193,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[60],"tags":[],"class_list":["post-2194","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-isa-proyectos-en"],"_links":{"self":[{"href":"https:\/\/www.isaproyectos.com\/en\/wp-json\/wp\/v2\/posts\/2194","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.isaproyectos.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.isaproyectos.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.isaproyectos.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.isaproyectos.com\/en\/wp-json\/wp\/v2\/comments?post=2194"}],"version-history":[{"count":2,"href":"https:\/\/www.isaproyectos.com\/en\/wp-json\/wp\/v2\/posts\/2194\/revisions"}],"predecessor-version":[{"id":2350,"href":"https:\/\/www.isaproyectos.com\/en\/wp-json\/wp\/v2\/posts\/2194\/revisions\/2350"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.isaproyectos.com\/en\/wp-json\/wp\/v2\/media\/2193"}],"wp:attachment":[{"href":"https:\/\/www.isaproyectos.com\/en\/wp-json\/wp\/v2\/media?parent=2194"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.isaproyectos.com\/en\/wp-json\/wp\/v2\/categories?post=2194"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.isaproyectos.com\/en\/wp-json\/wp\/v2\/tags?post=2194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}